HomeHelp and adviceHome improvements

Connecting to a sewer

壹点加速器2025-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

壹点加速器2025-outline

壹点加速器2025-outline

twitter2025  神龙加速器最新版,神龙加速器2025,神龙加速器不能用了,神龙加速器vpm  白给云官网,白给云ios下载,白给云免费永久加速,白给云2025  嫖了么机场最新版,嫖了么机场官方网址,嫖了么机场跑路了,嫖了么机场2025  云速加速器下载地址,云速加速器ios下载,云速加速器pc版下载,云速加速器2025年  维基百科镜像站2025